Construction site diary

Construction site diary

the work for the milk stalls on the North and Südbad

Here we will keep you up to date and provide you with current information about the construction phases.

In 2023, work began on the new framework at Nordbad Borkums. In 2024, work also started on the Südbad.

The new framework for the milk stalls has been firmly anchored and can therefore remain on the beach all year round. The milk stalls themselves will continue to be dismantled during the storm surge season, as required by coastal protection regulations. The current exemption from the NDG (Lower Saxony Dyke Act) permits the milk stalls to be erected between March 15.03 and October 31.10.

 

This is what some of the new milk stalls look like.

summer 2025

The milk stalls on the south beach, "Mathilde's Melkbudje" and "Milchbude Wattwurm," were also completed this summer. This concludes the construction work around the milk stalls. We look forward to many wonderful years of enjoying our new milk stalls!

summer 2025

July 31, 2024

"Hinnis Strandoase" is also finished and ready for many guests. Anyone who feels hungry or thirsty between this milk stall and the "sun deck" can get a little refreshment from the new food truck "Fischbutze on Tour".

July 31, 2024

June 4, 2024

The "Strandflair" milk stall was delivered and set up during the Pentecost week. Guests can now also stay in the new milk stall. Next up is "Hinnis Strandoase".

June 4, 2024

23 May 2024

The construction of the new milk stalls is progressing. Nordbad For example, the milk stall "Strandflair" is already taking shape.

23 May 2024

14 May 2024

In the last few days, the new flooring has already been installed in all of the stalls.
The "Strandflair" milk stall will soon shine in new splendor. In the coming days, the missing parts for this stall will arrive on the island and will then be built straight away.
The photos show the provisional construction of the original floor covering at the "Hinnis Strandoase" milk stall. The remaining parts of this milk stall are to be installed approximately 3 weeks after the delivery of the components from the "Strandflair" milk stall.

14 May 2024

26 April 2024

The first parts for the construction of the new milk stalls have landed on the island.

26 April 2024

23 April 2024

The kitchen and catering containers have just been Südbad erected. The new enclosure will come later.

23 April 2024

22 April 2024

Update Südbad:
From 23 April 2024, the construction of the new container elements for the milk stalls at Südbad This affects the two milk stalls "Mathilde's Melkbudje" and "Wattwurm". Due to delivery delays from a supplier who operates both milk stalls on Südbad served, they will not yet be able to stand on the beach in the completely new design. "We are looking forward to the construction and opening of the new milk stalls, probably on Ascension Day (May 09, 2024)," agree the two milk stall owners Manni Okken and Tobias Grass. "The delivery delays of some elements have no impact on our culinary offerings at both milk stalls, so we are looking forward to the start of the milk stall season on Südbad“ they add.
The delivery delay also affects the milk stalls at Nordbad, which, however, were already able to open with a temporary solution on the new foundations.

22 April 2024

12 April 2024

Today, the foundations of the milk stalls on the south beach were inspected. They have turned out well and can now be taken over by the milk stall operators. The North Sea spa Borkum GmbH will receive information next week from the operators, who are now responsible for the individual construction. Details on when and which milk stalls will be built will also be published in the construction log.

12 April 2024

04 April 2024

The concrete of the new milk stalls at Südbad is still protected with a film to allow it to dry evenly. The concrete will be dry by the end of April at the latest. The concrete workers have had several test cubes cast, which will then be "pressed" to determine when the milk stand operators can set up.

04 April 2024

March 25, 2024

The season on Nordbad is open. All three milk bars are open! The sun deck already has the new design, and the other two will follow soon.

March 25, 2024

March 19, 2024

As well on Nordbad Things are getting started now. The first Sonnendeck milk stall is being built!

March 19, 2024

March 12, 2024

All piles have now been installed and the formwork and reinforced concrete work will begin this week.

The concreting of the foundation for the milk stall “Mathilde’s Melkbudje” is expected to start on Thursday, March 14, 2024.

March 12, 2024

February 23, 2024

Meanwhile, the ship was Südbad The equipment has been unloaded and is ready for use on the beach. The remaining materials will arrive with the next shipment.

February 23, 2024

February 21, 2024

The construction of the new milk stalls will also begin in 2024 Borkum continue – currently on SüdbadA ship with materials and dredgers has arrived here and is waiting until it's dry. Then everything can be loaded onto the beach, where work will soon continue!

February 21, 2024

30 October 2023

Today the last milk stall was dismantled. They can be set up again next year from March 15.03.2024, XNUMX.

30 October 2023

04 October 2023

The "Strandflair" milk stall is expected to be dismantled on October 22.10.2023, XNUMX and the cart from the "Strandflair" milk stall a week later. Until then, you can still enjoy beautiful sunsets in the milk stalls.

04 October 2023

September 06, 2023

Preparations for the "Sonnendeck" milk stall are almost complete. The milk stall is expected to open this evening, or tomorrow at the latest.

September 06, 2023

August 23, 2023

The new milk stall "Sonnendeck" is being placed on the framework today!

August 23, 2023

August 18, 2023

Today we started laying the rails for the "Sonnendeck" milk stall. The containers can probably be pushed onto the framework at the beginning of next week.

August 18, 2023

August 05, 2023

The concrete at the "Strandflair" milk stall has hardened and the work has been completed.

August 05, 2023

August 04, 2023

The concrete at the "Strandflair" milk stall has been poured and now just needs to harden.

August 04, 2023

August 02, 2023

The "Sonnendeck" milk stall is open this morning Borkum arrived and was unloaded in the safe harbor.

August 02, 2023

August 01, 2023

The formwork work for the "Strandflair" milk stall is almost finished and the concrete will soon be poured.

August 01, 2023

July 24, 2023

The milk stand "Strandflair" has recently set up a food truck with seating to the right of the actual milk stand.

July 24, 2023

July 20, 2023

At the "Sonnendeck" site, work has been completed, the concrete only needs to harden completely.

July 20, 2023

July 14, 2023

The milk stall parts of the new "Sonnendeck" milk stall have arrived at Hinsche Gastrowelt in Oldenburg. When the counter's blinds are Borkum opens, the Nordbad be the new home of the milk stall.

July 14, 2023

July 11, 2023

Today, some of the devices have already been transported back to the mainland by sea.

July 11, 2023

July 10, 2023

The formwork work at the "Sonnendeck" site is continuing diligently.

July 10, 2023

July 06, 2023

Formwork work has begun at the "Sonnendeck" site.

July 06, 2023

July 03, 2023

The concrete at the "Hinni's Strandoase" site has now hardened and the formwork could be removed.

July 03, 2023

June 27, 2023

At the site of "Hinni's Strandoase" the concrete was poured into the formwork today.

June 27, 2023

June 26, 2023

At the "Sonnendeck" site, formwork work is currently in full swing.

June 26, 2023

June 20, 2023

At the regular location of the "Strandflair" all eight posts have now been driven into the ground.
The company "Günter Terfehr" begins its work at the "Sonnendeck" site.

June 20, 2023

June 19, 2023

Am Nordbad A total of four stalls are now available for guest catering: "Hinni's Beach Oasis," the "Mini Sundeck," the "Strandflair," and the new "Milchbude." This one also now supplies you with freshly squeezed milk and fruit every day.

June 19, 2023

June 16, 2023

Pile-driving work is currently being carried out at the site of the "Strandflair" milk stall. This should be completed before the start of the holidays, so that the noisy work on the beaches will then be over.
The formwork work at the "Hinni's Strandoase" site has been completed, which is why the concrete work can begin next week.
Formwork work will start at the "Sonnendeck" site next week.

June 16, 2023

June 15, 2023

In the background, work on the "Sonnendeck" milk stall is in full swing so that it can be opened this summer at Borkumer Nordbad will stand.

June 15, 2023

June 14, 2023

All work is being diligently continued. The picture shows the location of the milk stall "Hinni's Strandoase".

June 14, 2023

June 13, 2023

Work on the "Sonnendeck" construction site can continue. At the same time, construction work by the Terfehr company will continue at the "Hinni's Strandoase" site.

June 13, 2023

June 12, 2023

Today, digging work began at the regular location of the milk stall "Strandflair".
Meanwhile, the formwork work continues at the "Hinni's Strandoase" site.

June 12, 2023

June 09, 2023

Due to damage to the vibrator, work on the device has been delayed until the replacement part has arrived on the island and can be installed. A new device has already been organized by the construction company and is due to arrive on the island on Tuesday.
Regardless of this, preparation of the excavation pit at site 1 (Strandflair) will begin on Monday so as not to lose any time. This means that work will continue unhindered.

June 09, 2023

June 07, 2023

Formwork work has begun at the "Hinni's Strandoase" site.
At the same time, more steel pipes are being driven into the ground between the "Mini Sundeck" and the "Strandflair".

June 07, 2023

June 06, 2023

Work is now continuing on the construction pit between the "Strandflair" milk stall and the "Mini Sonnendeck".
This is where the first steel pipe was driven into the ground.

June 06, 2023

June 05, 2023

The steel pipes at the "Hinni's Strandoase" location are cut to the same height. At the same time, the water is pumped out of the hole at the "Mini Sonnendeck" location so that the next work can begin there.

June 05, 2023

June 02, 2023

The hole at the "Hinni's Strandoase" location will be closed.

June 02, 2023

31 May 2023

Today the remaining steel pipes were driven into the ground, meaning that the piling work at the "Hinni's Strandoase" site was completed today. The concrete work is expected to begin tomorrow.

31 May 2023

25 May 2023

At the site of "Hinni's Strandoase" the first two steel pipes were driven into the ground.
The reinforcing bars for the concrete work are already being stored on the beach, so that work is expected to begin next week.

25 May 2023

24 May 2023

On the far left Nordbad The temporary version of "Hinni's Strandoase" is now open. Directly to the right (facing the sea) of the regular milk stall location, you'll find seating, food, and drinks here.

24 May 2023

22 May 2023

A few meters to the left (looking towards the sea) of the "Strandflair" milk stall, you will find the "Mini Sundeck." Until the construction work is completed and the new milk stall is ready for use, Borkum arrives, the transitional version of the future "Sun Deck" will provide you with Natt & Drög in the meantime.

22 May 2023

19 May 2023

The "beach flair" is waiting for you at the transitional area. A few meters further to the left of the well-known regular area (view towards the sea). More photos of the current stalls and kiosks will follow in the next few days, which will also be happy to welcome your visit during the transition period until the regular milk stalls open.

19 May 2023

16 May 2023

Something has also happened at the former and future location of the "Hinni's Strandoase" milk stall. The old framework has been removed and the first digging work has begun here as well.

16 May 2023

15 May 2023

Some sand has already been lifted out of the hole and the water has been pumped out for further digging.

15 May 2023

10 May 2023

Let's go with the equipment to the first construction site! The first construction work on the site of the future "Sonnendeck" milk stall is starting.

10 May 2023

09 May 2023

The last ship with all missing materials is on Nordbad arrived and waits until it is dry. Then the materials and vehicles can be Borkumthe beach, from where everything is then distributed.

09 May 2023